CASES
工程案例
Malaysia Grand Continental Hotel Kuching is located in the heart of Kuching, the capital of Sarawak, Malaysia. It is a three-star hotel that integrates business, vacation and conferences.As a hotel in a tropical area, its air-conditioning system needs to operate uninterruptedly throughout the year, which places extremely high demands on the energy efficiency and environmental adaptability of the cooling equipment.
Equipment used in the project:
HON MING FRP open cross flow cooling tower

Copy product links
Long by picture save/share

周一到周五
hm@honming.cn